The Hotel
![](https://precon.com.au/wp-content/uploads/2023/11/single-pod-01.png)
![](https://precon.com.au/wp-content/uploads/2023/11/single-pod-02.png)
The Hotel room is designed to fit on a 3.5m (W) x 10m (L) steel reinforced concrete slab poured in factory and transported to site at a later stage. A steel structure on each corner of the slab is implanted to set base for four concrete columns. Vertical reinforcement is inserted into the pe-installed conduit then grouted. The Hotel room includes a kitchenette, a full bathroom, a bedroom area and a lounge. The single pods are stacked vertically and horizontally to shape a full building. This process is repeated allowing a fast and effective construction of a high-rise.
![](https://precon.com.au/wp-content/uploads/2023/11/Single-pod-03.png)
![](https://precon.com.au/wp-content/uploads/2023/11/Single-pod-04.png)
![](https://precon.com.au/wp-content/uploads/2023/11/Single-pod-05.png)